Skip to content

Set up a pipeline's stages

Add, rename, reorder and archive stages, mark one as waiting on someone else, and ask for details before a lead moves in.

5 minutesOwners and adminsUpdated

Stages are the steps a lead moves through, in the order they show on the board.

  • A plan that includes leads
  • Create and edit under Lead settings in your role. Managers, admins and owners have it.
  • Optional: fields, if a stage should ask for details.
  1. Go to Settings > Leads (opens Soosh in a new tab). On the Pipelines tab, click the pipeline’s name.
  2. Under Stages, click Add stage.
  3. In Name, enter the step, like Site visit booked.
  4. In A lead in this stage is, choose Still open, Won or Lost.
  5. For an open stage, optional: turn on Waiting on someone else, for a step that rests with an insurer, a bank or a school. Leads there don’t show under No next step and don’t go stale.
  6. For any other open stage, optional: in Stale after, enter the days a lead can stay before it shows Stale. Leave it empty if leads can stay as long as they need.
  7. Optional: under Needed before moving here, tick the fields someone must fill in to move a lead into this stage.
  8. Click Add.

A new open stage goes after the last open stage. To place it, use the menu below.

  1. Click the three dots (Options for the stage) at the end of its row.
  2. Choose Edit to change it, Move up or Move down to reorder, or Archive.
  3. For Archive, confirm with Archive.

The board shows the stages in your order. A row says Waiting, Stale after 7 days or Needs Budget when it applies.

A few rules keep leads safe:

  • A pipeline keeps at least one open, one Won and one Lost stage. The last stage of a kind can be renamed, not moved or archived.
  • Once a lead has been in a stage, its kind can’t change. Add a new stage instead.
  • A stage with leads in it can’t be archived. Move them first.
  • An archived stage leaves the board, and no lead can move into it. Leads that went through it keep it in their history.